New England Wind (OCS-A 0534) Construction and Operations Plan

Volume I

Volume II-A

  • Volume II-A Text (Updated February 2024)
  • Volume II-A Appendices – Appendix II-A Data Processing and Quality Summary
  • Volume II-A Appendices – Appendix II-B Hazard Definitions
  • Volume II-A Appendices – Appendix II-C 2016 Geophysical Operations Report
  • Volume II-A Appendices – Appendix II-D 2016 Geotechnical Operations Report
  • Volume II-A Appendices – Appendix II-E 2017 Geophysical and Geotechnical Operations Report
  • Volume II-A Appendices – Appendix II-F 2019 Geotechnical Interpretative Report (GIR)
  • Volume II-A Appendices – Appendix II-G MEC-UXO Desktop Studies 
  • Volume II-A Appendices – Appendix II-H 2016-2020 Benthic Reports  (Updated February 2024)
  • Volume II-A Appendices – Appendix II-I New England Wind Drawings 

Volume II-B

  • Volume II-B Appendix II-J Route Position Listings for Cable Corridor
  • Volume II-B Appendix II-K Side Scan Sonar Contact Listings
  • Volume II-B Appendix II-L Magnetic Anomaly Listings
  • Volume II-B Appendix II-M 2016 Grab Sample Results
  • Volume II-B Appendix II-N 2016 CPT and Borehole Logs and Lab Results
  • Volume II-B Appendix II-O 2017 Grab Sample Photographs and Grain Size Results
  • Volume II-B Appendix II-P 2017 Vibracore Photographs, Grain Size, and Geotechnical Test Results
  • Volume II-B Appendix II-Q 2018 Geophysical and Geotechnical Operations Report-Alpine
  • Volume II-B Appendix II-R 2018 Geophysical & Geotechnical Operations Report-Seaforth
  • Volume II-B Appendix II-S 2018 Geotechnical Operations Report-Horizon, Boreholes
  • Volume II-B Appendix II-T 2018 Geotechnical Operations Report-Geoquip, CPTs
  • Volume II-B Appendix II-U 2016 Borehole Lab Testing – Fugro
  • Volume II-B Appendix II-V 2018 Geotechnical Factual Report – Horizon, Boreholes
  • Volume II-B Appendix II-W 2018 Geotechnical Factual Report – Geoquip, CPTs
  • Volume II-B Appendix II-X 2018 Vibracore Logging and Lab Results
  • Volume II-B Appendix II-Y 2018 Shallow CPT Results
  • Volume II-B Appendix II-Z 2018 Grab Sample Results
  • Volume II-B Appendix II-AA 2020 Ground Model Report – Geo SubSea

Volume II-C

  • Volume II-C Appendix II-AB 2019 Geophysical Operations Report – TerraSond
  • Volume II-C Appendix II-AC 2019 Geophysical Operations Report - EGS
  • Volume II-C Appendix II-AD 2019 Geotechnical Operations Report – Horizon
  • Volume II-C Appendix II-AE 2019 Geophysical and Geotechnical Operations Report - Seaforth
  • Volume II-C Appendix II-AF 2019 Geotechnical Operations Report - Alpine
  • Volume II-C Appendix II-AG 2019 Geotechnical Factual Report – Horizon
  • Volume II-C Appendix II-AH 2019 Vibracore Logging and Lab Results
  • Volume II-C Appendix II-AI 2019 Shallow CPT Results
  • Volume II-C Appendix II-AJ 2019 Grab Sample Results
  • Volume II-C Appendix II-AK 2016-2020 Geotechnical Clearance Memos and Plots
  • Volume II-C Appendix II-AL 2020 Geophysical Operation/Field Reports – EGS
  • Volume II-C Appendix II-AM 2020 Geotechnical Operation/Field Reports – EGS
  • Volume II-C Appendix II-AN 2020 Grab Sample Results – RPS
  • Volume II-C Appendix II-AO 2020 CPT and Boring Samples – Geoquip
  • Volume II-C Appendix II-AP 2020 Vibracore Results – EGS
  • Volume II-C Appendix II-AQ 2020 Boring Results – Geoquip
  • Volume II-C Appendix II-AR New England Wind Phase 2 Feasibility of Suction Bucket Design 

Volume II-D

Volume III

Addendum (Phase 2 Offshore Export Cable Corridor, South Coast Variant)