US Wind Construction and Operations Plan

US Wind Construction and Operations Plan 

Volume I: Project Information

Volume II: Site Characterization and Impact Assessment

Volume I - Appendices

Appendix A. Oil Spill Response Plan – December 2022

Appendix B. Safety Management System – December 2022

Appendix C. CVA Nomination Details (CONFIDENTIAL)

Appendix D. CVA Scope of work (CONFIDENTIAL)

Appendix E. Design Standards (CONFIDENTIAL)

Appendix F. WTG and OSS Locations

Appendix G. Waste Discharges and Releases

Appendix H. Chemical Products Used and Stored

Appendix I. Agency Contacts and Coordination

Appendix J. Preliminary Design Drawings (CONFIDENTIAL)

Appendix K. Meteorological Tower

Appendix L. Design Inputs

  • L1. Maryland OWF – Design Basis, r.2 (CONFIDENTIAL)
  • L2. Independent Metocean Assessment (CONFIDENTIAL)

Appendix M. Monopile Drivability Report (CONFIDENTIAL)

Appendix A. Geophysical and Geotechnical Reports

Appendix B. Sediment Transport Models

Appendix C1. Air Quality Emissions Calculations

Appendix D. Benthic Resources

Appendix E1. Essential Fish Habitat Assessment – revision July 2022

Appendix F. Fisheries

Appendix G1. Wetlands Delineations

Appendix H1. Underwater Acoustic Assessment Report

Appendix I. Archaeological and Historic Properties Assessments

Appendix J1. Visual Impact Assessment

Appendix K. Navigation and Military Activities

Appendix L. Socioeconomics

Appendix M. Coastal Zone Management

Appendix N. Avian